ITAC Assessment: SF0076
ITAC logo
ITAC Assessment: SF0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Medical Test Kits
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $5
M
to 10
M
# of Employees 81
Plant Area 48,000
ft2
Annual Production 73,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,795 1,060,668
kWh
Electricity Demand $35,460 2,837
kW-mo/yr
Natural Gas $12,688 1,811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,142 $31,230 $6,077
97,890
kWh
$7,065
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $2,898 $5,940 $1,340
21,688
kWh
$1,558
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $1,819 - $1,819
29,308
kWh
- -
04 2.4133: Use most efficient type of electric motors $698 $1,346 $430
7,034
kWh
$268
-
kW-mo/yr
-
05 3.3125: Use distillation, evaporation to remove contaminants $653 $2,800 - - $653
-
gal
TOTAL RECOMMENDED $19,210 $41,316 $9,666
155,920
kWh
$8,891
-
kW-mo/yr
$653
-
gal
TOTAL IMPLEMENTED $16,040 $37,170 $7,417
119,578
kWh
$8,623
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs