ITAC Assessment: SF0072
ITAC logo
ITAC Assessment: SF0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Anodized Aluminum
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range less than $500
k
# of Employees 8
Plant Area 12,000
ft2
Annual Production 454,920
lb
Production Hrs. Annual 2,346
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,033 117,819
kWh
Natural Gas $46,284 7,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $510 - $510
5,275
kWh
- - -
02 2.4314: Use synthetic lubricant $79 $169 $79
879
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,389 $1,123 - $3,389
-
MMBtu
- -
04 2.2514: Cover open tanks $98 $77 $98
879
kWh
- - -
05 3.5314: Use in-process recycling whenever possible $462 $250 - - - $462
06 3.1222: Reduce water use with counter current rinsing $4,047 $933 - - $4,047
-
Tgal
-
TOTAL RECOMMENDED $8,585 $2,552 $687
7,033
kWh
$3,389
-
MMBtu
$4,047
-
Tgal
$462
TOTAL IMPLEMENTED $1,149 $496 $687
7,033
kWh
- - $462