ITAC Assessment: SF0071
ITAC logo
ITAC Assessment: SF0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bread
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 30,000
ft2
Annual Production 2,600,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,908 343,200
kWh
Natural Gas $62,260 9,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $246 $554 $246
2,052
kWh
-
02 2.7135: Install occupancy sensors $1,941 $480 $1,941
25,791
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $665 $970 $665
6,155
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $219 $60 $219
2,638
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $116 - $116
3,810
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $155 $135 $155
1,758
kWh
-
07 2.6218: Turn off equipment when not in use $474 $100 $474
5,862
kWh
-
08 2.2511: Insulate bare equipment $53 $118 $53
586
kWh
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $556 $400 - $556
-
MMBtu
TOTAL RECOMMENDED $4,425 $2,817 $3,869
48,652
kWh
$556
-
MMBtu
TOTAL IMPLEMENTED $2,057 $2,024 $1,501
17,879
kWh
$556
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs