| Assessment Year | 1995 |
|---|---|
| Principal Product | Tofu, Pasta Products |
| NAICS |
n/a
|
| SIC | 2098: Macaroni, Spaghetti, Vermicelli, and Noodles |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
40,000
ft2
|
| Annual Production | 1,500,000
units
|
| Production Hrs. Annual | 2,990
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $149,592 | 1,315,358 |
kWh
|
$0.11 |
| Natural Gas | $73,224 | 11,202 |
MMBtu
|
$6.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,924 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $602 | $610 |
$602
5,862
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,041 | $9,983 |
$3,041
28,429
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $2,395 | $4,330 |
$2,395
22,567
kWh
|
- | - | |
| 04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $5,535 | $14,820 | - |
$5,535
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $1,695 | $1,918 | - |
$1,695
-
MMBtu
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $421 | $758 |
$421
3,810
kWh
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,114 | $40 |
$1,114
10,551
kWh
|
- | - | |
| 08 | 2.2123: Insulate feedwater tank | $307 | $702 | - |
$307
-
MMBtu
|
- | |
| 09 | 2.2121: Increase amount of condensate returned | $8,250 | $1,620 | - |
$4,248
-
MMBtu
|
$4,002
-
Tgal
|
|
| TOTAL RECOMMENDED | $23,360 | $34,781 |
$7,573
71,219
kWh
|
$11,785
-
MMBtu
|
$4,002
-
Tgal
|
||
| TOTAL IMPLEMENTED | $17,924 | $20,468 |
$2,137
20,223
kWh
|
$11,785
-
MMBtu
|
$4,002
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||