Assessment Year | 1995 |
---|---|
Principal Product | Finished Wood Door Stock |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
59,200
ft2
|
Annual Production | 7,800
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $226,063 | 1,991,794 |
kWh
|
$0.11 |
Natural Gas | $4,488 | 701 |
MMBtu
|
$6.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,350 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,195 | $1,746 | n/a |
$1,195
10,551
kWh
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,404 | $4,680 | n/a |
$1,404
12,309
kWh
|
03 | 2.7134: Use photocell controls | $1,710 | $3,150 | n/a |
$1,710
14,947
kWh
|
04 | 2.3212: Optimize plant power factor | $2,222 | $3,227 | n/a |
$2,222
-
kWh
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,877 | $94,943 | n/a |
$23,877
210,434
kWh
|
06 | 2.6218: Turn off equipment when not in use | $831 | $1,380 | n/a |
$831
7,327
kWh
|
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $565 | - | n/a |
$565
-
kWh
|
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,592 | - | n/a |
$2,592
28,136
kWh
|
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,744 | $3,255 | n/a |
$1,744
15,240
kWh
|
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,210 | $854 | n/a |
$5,210
46,014
kWh
|
TOTAL RECOMMENDED | $41,350 | $113,235 |
$41,350
344,958
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs