| Assessment Year | 1995 |
|---|---|
| Principal Product | Calf Milk Replacer |
| NAICS |
n/a
|
| SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
60,000
ft2
|
| Annual Production | 15,000
ton
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $109,274 | 946,952 |
kWh
|
$0.12 |
| Natural Gas | $1,746 | 245 |
MMBtu
|
$7.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,279 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,407 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,292 | $6,960 |
$2,292
20,516
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $375 | $795 |
$375
3,224
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $3,408 | $1,478 |
$3,408
29,308
kWh
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,075 | - |
$1,075
9,379
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $758 | $450 |
$758
6,448
kWh
|
- | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $33,872 | $6,773 |
$45,858
394,783
kWh
|
$(-11,986.0)
-
MMBtu
|
|
| 07 | 2.4239: Eliminate or reduce compressed air usage | $696 | $850 |
$696
5,862
kWh
|
- | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,803 | - |
$2,803
24,326
kWh
|
- | |
| TOTAL RECOMMENDED | $45,279 | $17,306 |
$57,265
493,846
kWh
|
$(-11,986.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,407 | $10,533 |
$11,407
99,063
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs