ITAC Assessment: SF0067
ITAC logo
ITAC Assessment: SF0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Calf Milk Replacer
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 60,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,274 946,952
kWh
Natural Gas $1,746 245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,292 $6,960 $2,292
20,516
kWh
-
02 2.4133: Use most efficient type of electric motors $375 $795 $375
3,224
kWh
-
03 2.7135: Install occupancy sensors $3,408 $1,478 $3,408
29,308
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $1,075 - $1,075
9,379
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $758 $450 $758
6,448
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $33,872 $6,773 $45,858
394,783
kWh
$(-11,986.0)
-
MMBtu
07 2.4239: Eliminate or reduce compressed air usage $696 $850 $696
5,862
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $2,803 - $2,803
24,326
kWh
-
TOTAL RECOMMENDED $45,279 $17,306 $57,265
493,846
kWh
$(-11,986.0)
-
MMBtu
TOTAL IMPLEMENTED $11,407 $10,533 $11,407
99,063
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs