ITAC Assessment: SF0062
ITAC logo
ITAC Assessment: SF0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Adhesives, Glue, and Gummed Paper Tape
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 45,000
ft2
Annual Production 9,000
thousand feet
Production Hrs. Annual 2,750
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,699 529,601
kWh
Natural Gas $42,527 6,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,275 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $282 $364 $282
2,345
kWh
- - - - -
02 2.6218: Turn off equipment when not in use $314 $870 $314
2,638
kWh
- - - - -
03 2.6218: Turn off equipment when not in use $359 - $359
2,931
kWh
- - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $878 $618 $878
7,620
kWh
- - - - -
05 2.2437: Recover waste heat from equipment $1,449 $3,504 - $1,449
-
MMBtu
- - - -
06 2.2121: Increase amount of condensate returned $2,272 $2,605 - $659
-
MMBtu
$1,613
-
Tgal
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $486 $100 $486
4,103
kWh
- - - - -
08 2.4239: Eliminate or reduce compressed air usage $554 $582 $554
4,689
kWh
- - - - -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,885 $587 $8,911
76,495
kWh
$(-2,026.0)
-
MMBtu
- - - -
10 3.5143: Return spent solutions to the manufacturer $2,823 $50 - - - $2,823
-
gal
- -
11 3.4155: Meter waste water $676 $2,700 - - - - - $676
12 3.5217: Reuse / recycle/ sell paper products $12,953 $16,050 - - - - $12,953
-
lb
-
13 3.5311: Recover and reuse waste material $5,344 $4,584 - - - - $5,344
-
lb
-
TOTAL RECOMMENDED $35,275 $32,614 $11,784
100,821
kWh
$82
-
MMBtu
$1,613
-
Tgal
$2,823
-
gal
$18,297
-
lb
$676
TOTAL IMPLEMENTED $33,272 $28,528 $11,230
96,132
kWh
$(-1,367.0)
-
MMBtu
$1,613
-
Tgal
$2,823
-
gal
$18,297
-
lb
$676
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs