ITAC Assessment: GT0604
ITAC logo
ITAC Assessment: GT0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Billboards
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area 50,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,558 390,094
kWh
Electricity Demand $17,099 1,231
kW-mo/yr
Electricity Fees $4,027 -
Natural Gas $3,887 669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $4,940 - - - $4,940
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $720 $300 - $720
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,504 $11,400 $3,784
103,751
kWh
$1,720
-
kW-mo/yr
-
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,700 $5,000 - - $14,700
TOTAL RECOMMENDED $25,864 $16,700 $3,784
103,751
kWh
$2,440
-
kW-mo/yr
$19,640
TOTAL IMPLEMENTED $10,444 $11,400 $3,784
103,751
kWh
$1,720
-
kW-mo/yr
$4,940
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs