ITAC Assessment: SF0043
ITAC logo
ITAC Assessment: SF0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Roasted Coffee
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 42,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $738,118 10,025,498
kWh
Natural Gas $236,907 82,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,044 $2,794 $3,044
41,325
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,403 $9,820 $3,403
46,307
kWh
-
03 2.7135: Install occupancy sensors $2,561 $1,608 $2,561
34,877
kWh
-
04 2.4314: Use synthetic lubricant $2,093 - $2,093
28,429
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,020 $250 $1,020
13,775
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,273 $3,317 $4,273
58,030
kWh
-
07 2.4323: Use optimum size and capacity equipment $3,427 $2,665 - $3,427
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,772 $10,800 $7,772
105,510
kWh
-
09 2.1213: Direct warmest air to combustion intake $11,302 $3,350 - $11,302
-
MMBtu
10 2.4323: Use optimum size and capacity equipment $6,328 $550 - $6,328
-
MMBtu
TOTAL RECOMMENDED $45,223 $35,154 $24,166
328,253
kWh
$21,057
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs