ITAC Assessment: SF0036
ITAC logo
ITAC Assessment: SF0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Computer Hard Disks
NAICS
n/a
SIC 3572: Computer Storage Devices
Sales Range $50
M
to 100
M
# of Employees 525
Plant Area 100,940
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,120,212 15,222,743
kWh
Natural Gas $25,470 4,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $5,091 $4,219 $5,091
69,168
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,761 $12,763 $9,761
132,767
kWh
03 2.7135: Install occupancy sensors $1,751 $4,080 $1,751
23,740
kWh
04 2.6218: Turn off equipment when not in use $1,893 $3,880 $1,893
25,791
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,020 $40 $3,020
41,032
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,557 $1,457 $3,557
48,359
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,419 $7,395 $5,419
73,564
kWh
TOTAL RECOMMENDED $30,492 $33,834 $30,492
414,421
kWh
TOTAL IMPLEMENTED $19,765 $20,902 $19,765
268,758
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs