ITAC Assessment: SF0035
ITAC logo
ITAC Assessment: SF0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Clay Pipes
NAICS
n/a
SIC 3259: Structural Clay Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 871,200
ft2
Annual Production 32,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $472,030 4,789,273
kWh
Natural Gas $1,619,773 569,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,055 $1,298 $2,055
21,102
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,720 $21,935 $11,720
119,578
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,368 $900 $11,368
116,061
kWh
-
04 2.2511: Insulate bare equipment $116,693 $13,400 - $116,693
-
MMBtu
05 2.4314: Use synthetic lubricant $781 - $781
7,913
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,453 $4,943 $3,453
35,170
kWh
-
07 2.2437: Recover waste heat from equipment $25,360 $12,000 - $25,360
-
MMBtu
TOTAL RECOMMENDED $171,430 $54,476 $29,377
299,824
kWh
$142,053
-
MMBtu
TOTAL IMPLEMENTED $17,657 $7,141 $17,657
180,246
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs