ITAC Assessment: SF0033
ITAC logo
ITAC Assessment: SF0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Food and Nutritional Products
NAICS
n/a
SIC 2094:
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 2,200,000
ton
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,708 570,047
kWh
Natural Gas $5,946 1,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,337 $6,224 $3,337
26,377
kWh
02 2.4133: Use most efficient type of electric motors $449 $206 $449
3,517
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,575 $6,000 $1,575
12,603
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,548 $900 $1,548
12,309
kWh
05 2.4314: Use synthetic lubricant $185 - $185
1,465
kWh
TOTAL RECOMMENDED $7,094 $13,330 $7,094
56,271
kWh
TOTAL IMPLEMENTED $1,733 $900 $1,733
13,774
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs