ITAC Assessment: SF0032
ITAC logo
ITAC Assessment: SF0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Custom Rubber Products
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 51,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 2,016
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,572 2,745,897
kWh
Natural Gas $111,782 38,901
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,213 $3,566 $2,213
25,205
kWh
-
02 2.7135: Install occupancy sensors $198 $840 $198
2,345
kWh
-
03 2.3212: Optimize plant power factor $1,533 $2,948 $1,533
-
kWh
-
04 2.2136: Install / repair insulation on steam lines $5,040 $17,134 - $5,040
-
MMBtu
05 2.2511: Insulate bare equipment $20,575 $46,287 - $20,575
-
MMBtu
06 2.2511: Insulate bare equipment $1,244 $4,261 - $1,244
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $323 $1,176 $323
3,810
kWh
-
08 2.4322: Use or replace with energy efficient substitutes $1,369 $4,400 $1,369
15,533
kWh
-
09 2.4314: Use synthetic lubricant $669 - $669
16,706
kWh
-
TOTAL RECOMMENDED $33,164 $80,612 $6,305
63,599
kWh
$26,859
-
MMBtu
TOTAL IMPLEMENTED $30,064 $72,424 $3,205
45,721
kWh
$26,859
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs