Assessment Year | 1994 |
---|---|
Principal Product | Candy |
NAICS |
n/a
|
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
210,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 4,144
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $640,059 | 7,902,990 |
kWh
|
$0.081 |
Natural Gas | $167,892 | 49,359 |
MMBtu
|
$3.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $462,686 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,533 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $20,615 | $15,734 |
$20,615
254,689
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,091 | $12,697 |
$7,091
87,632
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $11,565 | $13,467 |
$11,565
142,732
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,728 | $10,400 |
$7,728
95,545
kWh
|
- | |
05 | 2.3212: Optimize plant power factor | $3,399 | $6,386 |
$3,399
-
kWh
|
- | |
06 | 2.5194: Redesign process | $4,700 | $15,500 | - |
$4,700
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,105 | $5,500 |
$1,105
13,775
kWh
|
- | |
08 | 2.6218: Turn off equipment when not in use | $4,300 | $200 |
$4,300
53,048
kWh
|
- | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,030 | - | - |
$3,030
-
MMBtu
|
|
10 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $399,153 | $979,000 |
$464,337
6,072,685
kWh
|
$(-65,184.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $462,686 | $1,058,884 |
$520,140
6,720,106
kWh
|
$(-57,454.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $63,533 | $79,884 |
$55,803
647,421
kWh
|
$7,730
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs