ITAC Assessment: SF0019
ITAC logo
ITAC Assessment: SF0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Metal Finishings
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,450 451,641
kWh
Natural Gas $48,704 9,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,055 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3137: Use power during off-peak periods $6,225 $4,000 $6,225
-
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,939 $800 - $3,939
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,685 $400 $1,685
16,413
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,026 $1,671 $1,026
8,206
kWh
-
05 2.4133: Use most efficient type of electric motors $796 $348 $796
7,327
kWh
-
06 2.2511: Insulate bare equipment $384 $745 - $384
-
MMBtu
TOTAL RECOMMENDED $14,055 $7,964 $9,732
31,946
kWh
$4,323
-
MMBtu
TOTAL IMPLEMENTED $13,259 $7,616 $8,936
24,619
kWh
$4,323
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs