ITAC Assessment: SF0017
ITAC logo
ITAC Assessment: SF0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Semiconductor Etching Equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 95,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,191 5,167,351
kWh
Natural Gas $37,659 6,859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $64,588 $172,000 n/a - $64,588
02 2.4133: Use most efficient type of electric motors $15,358 $15,212 n/a $15,358
167,644
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,285 $4,058 n/a $2,285
24,912
kWh
-
04 2.7131: Add area lighting switches $26,202 $2,990 n/a $26,202
286,049
kWh
-
05 2.7135: Install occupancy sensors $3,582 $1,470 n/a $3,582
39,273
kWh
-
06 2.3212: Optimize plant power factor $3,945 $7,558 n/a $3,945
-
kWh
-
07 2.6218: Turn off equipment when not in use $5,641 $3,560 n/a $5,641
61,547
kWh
-
08 2.7111: Reduce illumination to minimum necessary levels $3,564 $488 n/a $3,564
38,980
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,917 $2,400 n/a $1,917
20,809
kWh
-
TOTAL RECOMMENDED $127,082 $209,736 $62,494
639,214
kWh
$64,588
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs