Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom Molded Plastics and Cork
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 140,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $389,715 4,210,434
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,163

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $18,225 $2,514 $18,225
197,245
kWh
02 2.4133: Use most efficient type of electric motors $9,017 $4,460 $9,017
97,304
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,329 $3,611 $2,329
25,205
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,817 $600 $1,817
19,637
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,548 $550 $2,548
27,550
kWh
06 2.8114: Change rate schedules or other changes in utility service $44,008 $149,000 $44,008
-
kWh
07 2.3212: Optimize plant power factor $3,213 $5,507 $3,213
-
kWh
TOTAL RECOMMENDED $81,157 $166,242 $81,157
366,941
kWh
TOTAL IMPLEMENTED $13,163 $8,671 $13,163
142,146
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs