ITAC Assessment: MA0705
ITAC logo
ITAC Assessment: MA0705
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product coated wires and cables
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 82,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 6,300
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,336 1,595,400
kWh
Electricity Demand $23,961 6,314
kW-mo/yr
Electricity Fees $12,152 -
Natural Gas $6,905 631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $8,642 $200 - - $8,642
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,284 $19,400 $7,700
78,580
kWh
$584
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,053 $2,800 $6,053
61,772
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,037 $8,350 $6,037
61,612
kWh
- -
05 2.3212: Optimize plant power factor $3,939 $13,700 - $3,939
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $2,632 $4,231 $2,632
26,867
kWh
- -
07 2.8123: Pay utility bills on time $1,191 $500 - - $1,191
08 2.2136: Install / repair insulation on steam lines $244 $497 $244
2,488
kWh
- -
TOTAL RECOMMENDED $37,022 $49,678 $22,666
231,319
kWh
$4,523
-
kW-mo/yr
$9,833
TOTAL IMPLEMENTED $19,467 $36,400 $13,753
140,352
kWh
$4,523
-
kW-mo/yr
$1,191
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs