ITAC Assessment: SF0006
ITAC logo
ITAC Assessment: SF0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 80,000
ft2
Annual Production 350
ton
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,785 2,868,992
kWh
Natural Gas $4,885 774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8114: Change rate schedules or other changes in utility service $28,390 $64,000 $28,390
-
kWh
02 2.4133: Use most efficient type of electric motors $8,054 $7,585 $8,054
79,132
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,994 $2,625 $4,994
49,531
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,646 $8,584 $4,646
46,014
kWh
05 2.2511: Insulate bare equipment $4,602 $1,619 $4,602
45,721
kWh
06 2.2511: Insulate bare equipment $4,237 $4,789 $4,237
41,911
kWh
07 2.2511: Insulate bare equipment $698 $480 $698
7,034
kWh
TOTAL RECOMMENDED $55,621 $89,682 $55,621
269,343
kWh
TOTAL IMPLEMENTED $26,533 $25,202 $26,533
262,309
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs