ITAC Assessment: SF0003
ITAC logo
ITAC Assessment: SF0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 20,000
ft2
Annual Production 165,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,176 860,492
kWh
Natural Gas $883 121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7226: Use computer programs to optimize hvac performance $655 $192 $655
6,155
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,485 $900 $1,485
17,292
kWh
03 2.2515: Use optimum thickness insulation $3,546 $4,231 $3,546
29,601
kWh
04 2.2511: Insulate bare equipment $453 $557 $453
4,103
kWh
05 2.4133: Use most efficient type of electric motors $2,118 $3,875 $2,118
18,464
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,294 $14,000 $6,294
40,739
kWh
TOTAL RECOMMENDED $14,551 $23,755 $14,551
116,354
kWh
TOTAL IMPLEMENTED $14,098 $23,198 $14,098
112,251
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs