ITAC Assessment: SF0002
ITAC logo
ITAC Assessment: SF0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ceramics
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 792,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,811 237,397
kWh
Natural Gas $47,896 8,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $2,600 $5,300 $2,600
23,154
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $458 $200 $458
4,103
kWh
-
03 2.2437: Recover waste heat from equipment $793 $1,150 - $793
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,211 $572 $1,211
10,844
kWh
-
05 2.4133: Use most efficient type of electric motors $582 $985 $582
4,982
kWh
-
TOTAL RECOMMENDED $5,644 $8,207 $4,851
43,083
kWh
$793
-
MMBtu
TOTAL IMPLEMENTED $3,640 $6,485 $3,640
32,239
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs