ITAC Assessment: SD0683
ITAC logo
ITAC Assessment: SD0683
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic Food Packaging
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 115
Plant Area 367,000
ft2
Annual Production 26,900,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,661,670 17,346,000
kWh
Electricity Demand $728,656 39,569
kW-mo/yr
Electricity Fees $127,932 -
Natural Gas $38,990 2,797
MMBtu
Other Gas $2,726 1
MMBtu
TOTAL YEARLY COSTS $2,559,974
RECOMMENDED SAVINGS* $931,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $13,962 $40,000 $6,909
72,115
kWh
$7,053
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $65,552 $204,249 $36,139
377,230
kWh
$29,413
-
kW-mo/yr
03 2.3141: Use battery storage for demand control $702,807 $109,721 $(-80,443.3)
(-839,700)
kWh
$783,250
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,901 - $8,901
92,910
kWh
-
05 2.4133: Use most efficient type of electric motors $77,614 $85,595 $56,817
593,078
kWh
$20,797
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,575 $27,600 $5,943
62,037
kWh
$1,631
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,477 $8,478 $9,005
93,996
kWh
$2,472
-
kW-mo/yr
08 2.3132: Recharge batteries on during off-peak demand periods $5,832 - - $5,832
-
kW-mo/yr
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $125 $508 $98
1,023
kWh
$27
-
kW-mo/yr
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,873 $48,210 $29,715
310,187
kWh
$8,158
-
kW-mo/yr
TOTAL RECOMMENDED $931,717 $524,362 $73,083
762,876
kWh
$858,634
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs