Assessment Year | 2000 |
---|---|
Principal Product | Electrical fuses |
NAICS |
n/a
|
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
70,000
ft2
|
Annual Production | 34,000
pieces
|
Production Hrs. Annual | 8,570
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $210,781 | 7,270,516 |
kWh
|
$0.029 |
Electricity Demand | $112,795 | 13,407 |
kW-mo/yr
|
$8.41 |
Electricity Fees | $5,932 | - |
|
- |
Natural Gas | $12,210 | 1,962 |
MMBtu
|
$6.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,839 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,933 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $411 | $1,080 |
$243
8,499
kWh
|
$168
-
kW-mo/yr
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $4,495 | $100 |
$3,204
110,492
kWh
|
$1,291
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $8,142 | $5,000 | - | - |
$8,142
-
MMBtu
|
- | - | |
04 | 2.2141: Operate distillation columns efficiently | $292 | $1,100 |
$292
9,965
kWh
|
- | - | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $6,438 | $10,000 |
$6,438
222,157
kWh
|
- | - | - | - | |
06 | 2.7244: Revise smoke cleanup from operations | $6,218 | $8,400 |
$1,331
46,014
kWh
|
$2,301
-
kW-mo/yr
|
$4,086
-
MMBtu
|
- | $(-1,500.0) | |
07 | 3.4155: Meter waste water | $4,843 | $15,000 | - | - | - |
$4,843
-
Tgal
|
- | |
TOTAL RECOMMENDED | $30,839 | $40,680 |
$11,508
397,127
kWh
|
$3,760
-
kW-mo/yr
|
$12,228
-
MMBtu
|
$4,843
-
Tgal
|
$(-1,500.0) | ||
TOTAL IMPLEMENTED | $10,933 | $10,100 |
$9,642
332,649
kWh
|
$1,291
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs