ITAC Assessment: NC0196
ITAC logo
ITAC Assessment: NC0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Electrical fuses
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 70,000
ft2
Annual Production 34,000
pieces
Production Hrs. Annual 8,570
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,781 7,270,516
kWh
Electricity Demand $112,795 13,407
kW-mo/yr
Electricity Fees $5,932 -
Natural Gas $12,210 1,962
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $411 $1,080 $243
8,499
kWh
$168
-
kW-mo/yr
- - -
02 2.4239: Eliminate or reduce compressed air usage $4,495 $100 $3,204
110,492
kWh
$1,291
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $8,142 $5,000 - - $8,142
-
MMBtu
- -
04 2.2141: Operate distillation columns efficiently $292 $1,100 $292
9,965
kWh
- - - -
05 2.7241: Install outside air damper / economizer on hvac unit $6,438 $10,000 $6,438
222,157
kWh
- - - -
06 2.7244: Revise smoke cleanup from operations $6,218 $8,400 $1,331
46,014
kWh
$2,301
-
kW-mo/yr
$4,086
-
MMBtu
- $(-1,500.0)
07 3.4155: Meter waste water $4,843 $15,000 - - - $4,843
-
Tgal
-
TOTAL RECOMMENDED $30,839 $40,680 $11,508
397,127
kWh
$3,760
-
kW-mo/yr
$12,228
-
MMBtu
$4,843
-
Tgal
$(-1,500.0)
TOTAL IMPLEMENTED $10,933 $10,100 $9,642
332,649
kWh
$1,291
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs