ITAC Assessment: SD0681
ITAC logo
ITAC Assessment: SD0681
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Text Books
NAICS 511130: Book Publishers
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 39,899
ft2
Annual Production 90,000
units
Production Hrs. Annual 3,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,447 644,412
kWh
Electricity Demand $77,070 1,969
kW-mo/yr
TOTAL YEARLY COSTS $157,517
RECOMMENDED SAVINGS* $98,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $67,050 $117,007 $31,824
255,000
kWh
$35,226
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $6,649 $468 $(-455.0)
(-3,652)
kWh
$7,104
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,797 $16,081 $9,637
77,220
kWh
$11,160
-
kW-mo/yr
04 2.3132: Recharge batteries on during off-peak demand periods $3,534 - - $3,534
-
kW-mo/yr
05 2.2622: Replace existing chiller with high efficiency model $335 $5,118 $234
1,871
kWh
$101
-
kW-mo/yr
06 2.2622: Replace existing chiller with high efficiency model $487 $7,870 $395
3,169
kWh
$92
-
kW-mo/yr
TOTAL RECOMMENDED $98,851 $146,544 $41,635
333,608
kWh
$57,216
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs