ITAC Assessment: SD0674
ITAC logo
ITAC Assessment: SD0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aerospace Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 485
Plant Area 487,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 5,300
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $803,154 6,533,032
kWh
Electricity Demand $279,220 14,272
kW-mo/yr
Electricity Fees $161,339 -
TOTAL YEARLY COSTS $1,243,713
RECOMMENDED SAVINGS* $372,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $40,920 $211,796 $24,921
202,776
kWh
$15,999
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $229,613 $34,559 $(-32,505.0)
(-264,487)
kWh
$262,118
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,362 $5,179 $3,362
27,359
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,713 $3,252 $7,876
64,081
kWh
$2,838
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $955 - $955
7,769
kWh
-
06 2.7134: Use photocell controls $6,013 $17,466 $4,420
35,966
kWh
$1,593
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,881 $5,022 $9,855
80,188
kWh
$3,026
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,420 $105,716 $2,310
18,798
kWh
$1,110
-
kW-mo/yr
09 4.212: Adopt in-house material generation $39,724 $464,200 $39,724
323,222
kWh
-
10 2.4133: Use most efficient type of electric motors $282 $4,366 $144
1,172
kWh
$138
-
kW-mo/yr
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $77 $85 $56
459
kWh
$20
-
kW-mo/yr
12 2.7233: Use properly designed and sized hvac equipment $6,377 $44,800 $6,377
51,893
kWh
-
13 4.131: Modify process to reduce material use/cost $10,032 - $7,375
60,007
kWh
$2,657
-
kW-mo/yr
14 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,593 $3,237 $6,317
51,399
kWh
$2,276
-
kW-mo/yr
TOTAL RECOMMENDED $372,962 $899,678 $81,187
660,602
kWh
$291,774
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs