*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Bellows and Metal Hoses
NAICS 332510: Hardware Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 54,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,950
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,346 488,588
kWh
Electricity Demand $96,573 1,661
kW-mo/yr
Electricity Fees $(-45,866.0) -
TOTAL YEARLY COSTS $162,053
RECOMMENDED SAVINGS* $269,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,654

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,805 $300 $1,805
7,920
kWh
- -
02 2.3134: Shift from daytime to nighttime operation $28,974 - - $28,974
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,227 $4,339 $1,376
6,036
kWh
$851
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,654 $4,172 $4,092
17,957
kWh
$2,499
-
kW-mo/yr
$63
05 2.9114: Use solar heat to make electricty $111,629 $154,568 $48,816
214,200
kWh
$62,813
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $24,771 $37,377 $13,952
61,225
kWh
$10,819
-
kW-mo/yr
-
07 2.2625: Chill water to the highest temperature possible $473 - $267
1,172
kWh
$206
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,560 $30,577 $11,594
50,874
kWh
$8,966
-
kW-mo/yr
-
09 2.3141: Use battery storage for demand control $72,872 - $(-6,109.0)
(-26,806)
kWh
$78,981
-
kW-mo/yr
-
TOTAL RECOMMENDED $269,965 $231,333 $75,793
332,578
kWh
$194,109
-
kW-mo/yr
$63
TOTAL IMPLEMENTED $6,654 $4,172 $4,092
17,957
kWh
$2,499
-
kW-mo/yr
$63
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs