ITAC Assessment: SD0627
ITAC logo
ITAC Assessment: SD0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Blow Molded Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,756 2,802,715
kWh
Electricity Demand $205,038 6,989
kW-mo/yr
Electricity Fees $2,839 -
TOTAL YEARLY COSTS $488,633
RECOMMENDED SAVINGS* $172,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2511: Insulate bare equipment $634 $2,128 $461
4,596
kWh
$173
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,041 $48,250 $8,227
82,107
kWh
$3,814
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,383 $164,701 $36,444
363,716
kWh
$16,939
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,584 $7,660 $3,232
32,256
kWh
$1,352
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,101 $9,714 $4,848
48,384
kWh
$2,253
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,072 $2,788 $1,344
13,416
kWh
$704
-
kW-mo/yr
$24
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $776 $1,200 $530
5,282
kWh
$246
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $17,281 $41,842 $12,176
121,514
kWh
$5,105
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $74,599 $327,726 $28,975
289,170
kWh
$45,624
-
kW-mo/yr
-
TOTAL RECOMMENDED $172,471 $606,009 $96,237
960,441
kWh
$76,210
-
kW-mo/yr
$24
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs