ITAC Assessment: SD0622
ITAC logo
ITAC Assessment: SD0622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Sheet and Plate metal components
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 30,000
ft2
Annual Production 600,000
units
Production Hrs. Annual 3,825
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,112 106,955
kWh
Electricity Demand $73,634 1,418
kW-mo/yr
Electricity Fees $1,520 -
TOTAL YEARLY COSTS $142,266
RECOMMENDED SAVINGS* $30,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,056

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,131 $800 $8,967
14,290
kWh
$1,164
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,925 $6,341 $7,860
12,525
kWh
$2,035
-
kW-mo/yr
$30
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,372 $8,800 $4,719
7,520
kWh
$1,653
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,032 - $4,032
6,426
kWh
- -
TOTAL RECOMMENDED $30,460 $15,941 $25,578
40,761
kWh
$4,852
-
kW-mo/yr
$30
TOTAL IMPLEMENTED $20,056 $7,141 $16,827
26,815
kWh
$3,199
-
kW-mo/yr
$30
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs