ITAC Assessment: SD0618
ITAC logo
ITAC Assessment: SD0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Shower Door/Glass Enclosures
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 50,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,611 529,248
kWh
Electricity Demand $86,935 3,605
kW-mo/yr
Electricity Fees $7,639 -
TOTAL YEARLY COSTS $141,185
RECOMMENDED SAVINGS* $37,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4133: Use most efficient type of electric motors $24,573 $9,015 $14,455
164,080
kWh
$10,118
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,083 $11,396 $4,610
52,314
kWh
$3,234
-
kW-mo/yr
$239
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,958 - $3,958
44,925
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,155 $300 $815
9,246
kWh
$340
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,769 $20,711 $23,838
270,565
kWh
$13,692
-
kW-mo/yr
$239
TOTAL IMPLEMENTED $1,155 $300 $815
9,246
kWh
$340
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs