ITAC Assessment: SD0599
ITAC logo
ITAC Assessment: SD0599
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product graphite foil and yarn
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 135,000
ft2
Annual Production 3,600,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,917 4,224,580
kWh
Electricity Demand $288,581 11,251
kW-mo/yr
Waste Disposal Costs
Water Usage $19,883 4,966
Tgal
TOTAL YEARLY COSTS $578,381
RECOMMENDED SAVINGS* $31,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $12,200 $33,000 $7,864
123,061
kWh
$4,336
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,284 $8,600 $5,576
87,265
kWh
$1,708
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $7,370 $12,585 $4,751
74,357
kWh
$2,619
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,121 $630 $1,663
26,025
kWh
$458
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,596 $4,732 $1,613
25,246
kWh
$892
-
kW-mo/yr
$91
TOTAL RECOMMENDED $31,572 $59,547 $21,468
335,953
kWh
$10,013
-
kW-mo/yr
$91
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs