ITAC Assessment: SD0597
ITAC logo
ITAC Assessment: SD0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aircraft Wheels and Brakes
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 34,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,752 873,750
kWh
Electricity Demand $34,526 3,933
kW-mo/yr
Electricity Fees $15,876 -
TOTAL YEARLY COSTS $134,154
RECOMMENDED SAVINGS* $22,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,547

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $7,822 $17,000 $6,388
66,611
kWh
$1,434
-
kW-mo/yr
02 2.7232: Replace existing hvac unit with high efficiency model $8,897 $3,900 $7,081
73,834
kWh
$1,816
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,547 $225 $2,040
21,282
kWh
$507
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,307 $5,611 $1,541
16,077
kWh
$766
-
kW-mo/yr
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $691 $1,720 $691
7,203
kWh
-
TOTAL RECOMMENDED $22,264 $28,456 $17,741
185,007
kWh
$4,523
-
kW-mo/yr
TOTAL IMPLEMENTED $2,547 $225 $2,040
21,282
kWh
$507
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs