ITAC Assessment: SD0594
ITAC logo
ITAC Assessment: SD0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Industrial Machinery
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 110,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $329,709 2,341,357
kWh
Electricity Demand $104,634 7,612
kW-mo/yr
Electricity Fees $7,586 -
TOTAL YEARLY COSTS $441,929
RECOMMENDED SAVINGS* $57,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $12,740 $8,700 $11,952
84,887
kWh
$788
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,323 $11,533 $12,040
85,512
kWh
$1,885
-
kW-mo/yr
- $398
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,863 - $4,863
34,541
kWh
- - -
04 2.8123: Pay utility bills on time $25,266 - - - $25,266 -
TOTAL RECOMMENDED $57,192 $20,233 $28,855
204,940
kWh
$2,673
-
kW-mo/yr
$25,266 $398
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs