ITAC Assessment: SD0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Milk and Juice
NAICS 311511: Fluid Milk Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 80
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,056,479 25,538,056
kWh
Electricity Demand $537,734 56,884
kW-mo/yr
TOTAL YEARLY COSTS $2,594,213
RECOMMENDED SAVINGS* $112,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $61,433 $149,300 $56,100
696,903
kWh
$5,333
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,440 $12,400 $28,094
348,997
kWh
$6,346
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,470 $13,092 $9,360
116,274
kWh
$2,110
-
kW-mo/yr
04 2.7135: Install occupancy sensors $2,444 $900 $2,444
30,371
kWh
-
05 2.4133: Use most efficient type of electric motors $2,751 $5,661 $2,173
27,003
kWh
$578
-
kW-mo/yr
TOTAL RECOMMENDED $112,538 $181,353 $98,171
1,219,548
kWh
$14,367
-
kW-mo/yr
TOTAL IMPLEMENTED $110,094 $180,453 $95,727
1,189,177
kWh
$14,367
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs