Assessment Year | 2020 |
---|---|
Principal Product | Vinyl Floor Tiles |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3253: Ceramic Wall and Floor Tile |
Sales Range | $1 M to 5M |
# of Employees | 117 |
Plant Area |
225,869
ft2
|
Annual Production | 127,920,708
units
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,091,548 | 16,225,982 |
kWh
|
$0.067 |
Electricity Demand | $844,632 | 42,115 |
kW-mo/yr
|
$20.06 |
Natural Gas | $143,261 | 42,032 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | $2,079,441 | |||
RECOMMENDED SAVINGS* | $32,935 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,259 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,538 | $12,557 |
$8,972
133,299
kWh
|
$5,566
-
kW-mo/yr
|
|
02 | 2.7134: Use photocell controls | $4,341 | $4,995 |
$4,341
64,496
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,858 | $13,600 |
$3,613
53,690
kWh
|
$2,245
-
kW-mo/yr
|
|
04 | 2.4133: Use most efficient type of electric motors | $3,520 | $11,623 |
$2,098
31,175
kWh
|
$1,422
-
kW-mo/yr
|
|
05 | 2.7135: Install occupancy sensors | $2,043 | $900 |
$2,043
30,371
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,377 | $45 |
$849
12,628
kWh
|
$528
-
kW-mo/yr
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,259 | $75 |
$1,008
14,976
kWh
|
$251
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $32,935 | $43,795 |
$22,924
340,635
kWh
|
$10,011
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $1,259 | $75 |
$1,008
14,976
kWh
|
$251
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs