ITAC Assessment: SD0589
ITAC logo
ITAC Assessment: SD0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electronic Equipment
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 52,000
ft2
Annual Production 255,000
units
Production Hrs. Annual 2,672
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,252 650,402
kWh
Electricity Demand $76,844 2,182
kW-mo/yr
Electricity Fees $10,800 -
TOTAL YEARLY COSTS $162,896
RECOMMENDED SAVINGS* $11,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,426 $8,840 $4,328
37,408
kWh
$5,917
-
kW-mo/yr
$181
02 2.4231: Reduce the pressure of compressed air to the minimum required $442 - $442
3,823
kWh
- -
03 2.7496: Install partitions to reduce size of conditioned space $242 $120 $242
2,093
kWh
- -
TOTAL RECOMMENDED $11,110 $8,960 $5,012
43,324
kWh
$5,917
-
kW-mo/yr
$181
TOTAL IMPLEMENTED $11,110 $8,960 $5,012
43,324
kWh
$5,917
-
kW-mo/yr
$181
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs