ITAC Assessment: SD0584
ITAC logo
ITAC Assessment: SD0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 45,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,102 1,409,479
kWh
Electricity Demand $168,404 4,869
kW-mo/yr
Electricity Fees $8,947 -
TOTAL YEARLY COSTS $283,453
RECOMMENDED SAVINGS* $7,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,249 $11,435 $855
11,368
kWh
$1,394
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,045 $300 $848
11,260
kWh
$197
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $2,463 $13,165 $812
10,777
kWh
$1,651
-
kW-mo/yr
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $810 $1,204 $810
10,753
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $667 - $667
8,864
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $352 - $352
4,675
kWh
-
TOTAL RECOMMENDED $7,586 $26,104 $4,344
57,697
kWh
$3,242
-
kW-mo/yr
TOTAL IMPLEMENTED $4,175 $13,465 $2,327
30,901
kWh
$1,848
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs