ITAC Assessment: AS0092
ITAC logo
ITAC Assessment: AS0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PRE-HUNG DOORS
NAICS
n/a
SIC 2431: Millwork
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 300
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,211 218,054
kWh
Natural Gas $3,112 483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,501 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $917 $4,000 - $917
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $216 $312 $216
2,052
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $102 $210 $116
1,172
kWh
- $(-14.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $586 $382 $586
5,569
kWh
- -
05 2.4133: Use most efficient type of electric motors $228 $742 $228
2,052
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $316 - $316
2,931
kWh
- -
07 2.4314: Use synthetic lubricant $518 $926 $156
1,465
kWh
- $362
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $618 $1,000 $618
5,862
kWh
- -
TOTAL RECOMMENDED $3,501 $7,572 $2,236
21,103
kWh
$917
-
MMBtu
$348
TOTAL IMPLEMENTED $1,680 $2,668 $1,318
12,310
kWh
- $362