ITAC Assessment: SD0583
ITAC logo
ITAC Assessment: SD0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Custom Manufactured Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 47
Plant Area 20,000
ft2
Annual Production 260
ton
Production Hrs. Annual 4,208
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,485 994,232
kWh
Electricity Demand $82,897 2,440
kW-mo/yr
Electricity Fees $290 -
TOTAL YEARLY COSTS $215,672
RECOMMENDED SAVINGS* $64,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,166

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $22,060 $16,920 $22,060
165,491
kWh
- -
02 2.7232: Replace existing hvac unit with high efficiency model $30,675 $66,500 $20,330
152,539
kWh
$10,345
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,834 $8,535 $3,148
23,605
kWh
$2,624
-
kW-mo/yr
$62
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,649 $15,975 $2,692
20,198
kWh
$1,957
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,008 - $1,008
7,561
kWh
- -
TOTAL RECOMMENDED $64,226 $107,930 $49,238
369,394
kWh
$14,926
-
kW-mo/yr
$62
TOTAL IMPLEMENTED $42,166 $91,010 $27,178
203,903
kWh
$14,926
-
kW-mo/yr
$62
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs