Assessment Year | 2019 |
---|---|
Principal Product | Custom Manufactured Parts |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 47 |
Plant Area |
20,000
ft2
|
Annual Production | 260
ton
|
Production Hrs. Annual | 4,208
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,485 | 994,232 |
kWh
|
$0.13 |
Electricity Demand | $82,897 | 2,440 |
kW-mo/yr
|
$33.98 |
Electricity Fees | $290 | - |
|
- |
TOTAL YEARLY COSTS | $215,672 | |||
RECOMMENDED SAVINGS* | $64,226 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,166 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $22,060 | $16,920 |
$22,060
165,491
kWh
|
- | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $30,675 | $66,500 |
$20,330
152,539
kWh
|
$10,345
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,834 | $8,535 |
$3,148
23,605
kWh
|
$2,624
-
kW-mo/yr
|
$62 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,649 | $15,975 |
$2,692
20,198
kWh
|
$1,957
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,008 | - |
$1,008
7,561
kWh
|
- | - | |
TOTAL RECOMMENDED | $64,226 | $107,930 |
$49,238
369,394
kWh
|
$14,926
-
kW-mo/yr
|
$62 | ||
TOTAL IMPLEMENTED | $42,166 | $91,010 |
$27,178
203,903
kWh
|
$14,926
-
kW-mo/yr
|
$62 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs