ITAC Assessment: SD0579
ITAC logo
ITAC Assessment: SD0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water Pipes
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $50
M
to 100
M
# of Employees 114
Plant Area 4,200,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 4,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,628 3,145,485
kWh
Electricity Demand $192,157 12,694
kW-mo/yr
Electricity Fees $17,186 -
TOTAL YEARLY COSTS $475,971
RECOMMENDED SAVINGS* $52,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,925 $62,407 $19,282
227,384
kWh
$9,643
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,727 - $9,727
114,704
kWh
-
03 2.4133: Use most efficient type of electric motors $11,229 $21,116 $7,744
91,319
kWh
$3,485
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,737 $1,300 $1,561
18,411
kWh
$176
-
kW-mo/yr
05 2.7134: Use photocell controls $853 $1,600 $853
10,064
kWh
-
TOTAL RECOMMENDED $52,471 $86,423 $39,167
461,882
kWh
$13,304
-
kW-mo/yr
TOTAL IMPLEMENTED $23,546 $24,016 $19,885
234,498
kWh
$3,661
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs