| Assessment Year | 2019 |
|---|---|
| Principal Product | Thermoformers |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
49,000
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 5,508
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,005 | 1,739,028 |
kWh
|
$0.071 |
| Electricity Demand | $183,603 | 8,196 |
kW-mo/yr
|
$22.40 |
| Electricity Fees | $8,760 | - |
|
- |
| Natural Gas | $7,021 | 915 |
MMBtu
|
$7.68 |
| TOTAL YEARLY COSTS | $322,389 | |||
| RECOMMENDED SAVINGS* | $17,032 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,142 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,725 | $9,775 |
$4,334
61,303
kWh
|
$3,156
-
kW-mo/yr
|
$235 | |
| 02 | 2.4133: Use most efficient type of electric motors | $3,772 | $9,367 |
$3,772
53,364
kWh
|
- | - | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,459 | $2,540 |
$2,459
34,770
kWh
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,125 | - |
$1,125
15,914
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,306 | $875 |
$773
10,935
kWh
|
$533
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $645 | $400 |
$549
7,766
kWh
|
$96
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $17,032 | $22,957 |
$13,012
184,052
kWh
|
$3,785
-
kW-mo/yr
|
$235 | ||
| TOTAL IMPLEMENTED | $12,142 | $19,542 |
$8,655
122,433
kWh
|
$3,252
-
kW-mo/yr
|
$235 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs