Assessment Year | 2018 |
---|---|
Principal Product | Water Filtration Systems |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 134 |
Plant Area |
128,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,459 | 1,040,570 |
kWh
|
$0.033 |
Electricity Demand | $52,030 | 2,883 |
kW-mo/yr
|
$18.05 |
Electricity Fees | $8,940 | - |
|
- |
Natural Gas | $1,358 | 133 |
MMBtu
|
$10.20 |
TOTAL YEARLY COSTS | $96,787 | |||
RECOMMENDED SAVINGS* | $28,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $1,259 | - |
$1,259
13,988
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $886 | $300 |
$805
8,940
kWh
|
$81
-
kW-mo/yr
|
- | - | |
03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $485 | $1,290 |
$485
5,390
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $332 | - |
$332
3,688
kWh
|
- | - | - | |
05 | 3.1192: Reduce scrap production | $25,514 | $1,500 |
$35
370
kWh
|
$19
-
kW-mo/yr
|
$12,960 | $12,500 | |
TOTAL RECOMMENDED | $28,476 | $3,090 |
$2,916
32,376
kWh
|
$100
-
kW-mo/yr
|
$12,960 | $12,500 | ||
TOTAL IMPLEMENTED | $27,659 | $1,800 |
$2,099
23,298
kWh
|
$100
-
kW-mo/yr
|
$12,960 | $12,500 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs