| Assessment Year | 2018 |
|---|---|
| Principal Product | Water Filtration Systems |
| NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
| SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
| Sales Range | $10 M to 50M |
| # of Employees | 134 |
| Plant Area |
128,000
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,459 | 1,040,570 |
kWh
|
$0.033 |
| Electricity Demand | $52,030 | 2,883 |
kW-mo/yr
|
$18.05 |
| Electricity Fees | $8,940 | - |
|
- |
| Natural Gas | $1,358 | 133 |
MMBtu
|
$10.20 |
| TOTAL YEARLY COSTS | $96,787 | |||
| RECOMMENDED SAVINGS* | $28,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,659 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $1,259 | - |
$1,259
13,988
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $886 | $300 |
$805
8,940
kWh
|
$81
-
kW-mo/yr
|
- | - | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $485 | $1,290 |
$485
5,390
kWh
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $332 | - |
$332
3,688
kWh
|
- | - | - | |
| 05 | 3.1192: Reduce scrap production | $25,514 | $1,500 |
$35
370
kWh
|
$19
-
kW-mo/yr
|
$12,960 | $12,500 | |
| TOTAL RECOMMENDED | $28,476 | $3,090 |
$2,916
32,376
kWh
|
$100
-
kW-mo/yr
|
$12,960 | $12,500 | ||
| TOTAL IMPLEMENTED | $27,659 | $1,800 |
$2,099
23,298
kWh
|
$100
-
kW-mo/yr
|
$12,960 | $12,500 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs