ITAC Assessment: SD0574
ITAC logo
ITAC Assessment: SD0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Water Filtration Systems
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 134
Plant Area 128,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,459 1,040,570
kWh
Electricity Demand $52,030 2,883
kW-mo/yr
Electricity Fees $8,940 -
Natural Gas $1,358 133
MMBtu
TOTAL YEARLY COSTS $96,787
RECOMMENDED SAVINGS* $28,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $1,259 - $1,259
13,988
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $886 $300 $805
8,940
kWh
$81
-
kW-mo/yr
- -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $485 $1,290 $485
5,390
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $332 - $332
3,688
kWh
- - -
05 3.1192: Reduce scrap production $25,514 $1,500 $35
370
kWh
$19
-
kW-mo/yr
$12,960 $12,500
TOTAL RECOMMENDED $28,476 $3,090 $2,916
32,376
kWh
$100
-
kW-mo/yr
$12,960 $12,500
TOTAL IMPLEMENTED $27,659 $1,800 $2,099
23,298
kWh
$100
-
kW-mo/yr
$12,960 $12,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs