ITAC Assessment: SD0571
ITAC logo
ITAC Assessment: SD0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Plastic Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 80,000
ft2
Annual Production 300,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,527 4,812,782
kWh
Electricity Demand $266,002 13,608
kW-mo/yr
Electricity Fees $9,454 -
Natural Gas $3,915 448
MMBtu
TOTAL YEARLY COSTS $602,898
RECOMMENDED SAVINGS* $62,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1336: Install equipment to utilize waste fuel $35,866 $178,055 $6,135
91,313
kWh
$29,731
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $20,104 $28,000 $15,499
230,635
kWh
$4,605
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $3,128 $939 - - $3,128
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,822 $2,000 $2,822
42,000
kWh
- -
05 2.4133: Use most efficient type of electric motors $781 $3,825 $781
11,620
kWh
- -
TOTAL RECOMMENDED $62,701 $212,819 $25,237
375,568
kWh
$34,336
-
kW-mo/yr
$3,128
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs