| Assessment Year | 2018 |
|---|---|
| Principal Product | Aviation Products |
| NAICS | 488190: Other Support Activities for Air Transportation |
| SIC | 4581: Airports, Flying Fields, and Airport Terminal Services |
| Sales Range | $50 M to 100M |
| # of Employees | 85 |
| Plant Area |
40,000
ft2
|
| Annual Production | 500,000
units
|
| Production Hrs. Annual | 3,927
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $26,891 | 371,157 |
kWh
|
$0.072 |
| Electricity Demand | $41,163 | 1,880 |
kW-mo/yr
|
$21.90 |
| Electricity Fees | $2,659 | - |
|
- |
| Natural Gas | $31,916 | 4,098 |
MMBtu
|
$7.79 |
| Other Gas | $163 | 1 |
MMBtu
|
$163.00 |
| TOTAL YEARLY COSTS | $102,792 | |||
| RECOMMENDED SAVINGS* | $26,451 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1336: Install equipment to utilize waste fuel | $9,960 | $48,827 |
$1,776
24,499
kWh
|
$8,184
-
kW-mo/yr
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $6,773 | $20,484 |
$6,773
93,422
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,329 | $4,062 |
$2,219
30,607
kWh
|
$2,045
-
kW-mo/yr
|
- | $65 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,416 | $2,000 |
$3,416
47,125
kWh
|
- | - | - | |
| 05 | 2.7134: Use photocell controls | $1,089 | $2,220 |
$1,089
15,022
kWh
|
- | - | - | |
| 06 | 2.6218: Turn off equipment when not in use | $562 | $200 |
$477
6,585
kWh
|
- |
$85
-
MMBtu
|
- | |
| 07 | 2.2511: Insulate bare equipment | $322 | $406 | - | - |
$322
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $26,451 | $78,199 |
$15,750
217,260
kWh
|
$10,229
-
kW-mo/yr
|
$407
-
MMBtu
|
$65 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs