ITAC Assessment: SD0570
ITAC logo
ITAC Assessment: SD0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Aviation Products
NAICS 488190: Other Support Activities for Air Transportation
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 40,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 3,927
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,891 371,157
kWh
Electricity Demand $41,163 1,880
kW-mo/yr
Electricity Fees $2,659 -
Natural Gas $31,916 4,098
MMBtu
Other Gas $163 1
MMBtu
TOTAL YEARLY COSTS $102,792
RECOMMENDED SAVINGS* $26,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1336: Install equipment to utilize waste fuel $9,960 $48,827 $1,776
24,499
kWh
$8,184
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $6,773 $20,484 $6,773
93,422
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,329 $4,062 $2,219
30,607
kWh
$2,045
-
kW-mo/yr
- $65
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,416 $2,000 $3,416
47,125
kWh
- - -
05 2.7134: Use photocell controls $1,089 $2,220 $1,089
15,022
kWh
- - -
06 2.6218: Turn off equipment when not in use $562 $200 $477
6,585
kWh
- $85
-
MMBtu
-
07 2.2511: Insulate bare equipment $322 $406 - - $322
-
MMBtu
-
TOTAL RECOMMENDED $26,451 $78,199 $15,750
217,260
kWh
$10,229
-
kW-mo/yr
$407
-
MMBtu
$65
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs