ITAC Assessment: SD0569
ITAC logo
ITAC Assessment: SD0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Salad Toppings
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 240
Plant Area 515,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,521 3,649,619
kWh
Electricity Demand $179,672 8,819
kW-mo/yr
Electricity Fees $6,709 -
Natural Gas $283,818 50,420
MMBtu
TOTAL YEARLY COSTS $770,720
RECOMMENDED SAVINGS* $81,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.1336: Install equipment to utilize waste fuel $53,280 $265,840 $11,877
144,310
kWh
$41,403
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,921 $2,000 $13,921
169,153
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,832 $13,363 $3,542
43,039
kWh
$2,204
-
kW-mo/yr
$86
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,555 $6,800 $5,555
67,493
kWh
- -
05 2.7134: Use photocell controls $2,839 $11,100 $2,839
34,498
kWh
- -
TOTAL RECOMMENDED $81,427 $299,103 $37,734
458,493
kWh
$43,607
-
kW-mo/yr
$86
TOTAL IMPLEMENTED $22,592 $26,463 $20,302
246,690
kWh
$2,204
-
kW-mo/yr
$86
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs