ITAC Assessment: SD0568
ITAC logo
ITAC Assessment: SD0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Windows and Doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 202,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,973
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,160 1,052,003
kWh
Electricity Demand $52,891 3,465
kW-mo/yr
Electricity Fees $3,013 -
TOTAL YEARLY COSTS $140,064
RECOMMENDED SAVINGS* $4,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,647 $2,000 $1,647
20,588
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,096 - $1,096
13,704
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $742 $3,292 $407
5,090
kWh
$313
-
kW-mo/yr
$22
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $659 $2,850 $451
5,639
kWh
$208
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $475 $2,150 $475
5,936
kWh
- -
TOTAL RECOMMENDED $4,619 $10,292 $4,076
50,957
kWh
$521
-
kW-mo/yr
$22
TOTAL IMPLEMENTED $3,485 $5,292 $3,150
39,382
kWh
$313
-
kW-mo/yr
$22
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs