ITAC Assessment: SD0565
ITAC logo
ITAC Assessment: SD0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Aerospace manufacturing (composites, elastomerics, etc.)
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 55,000
ft2
Annual Production 400,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,013 599,319
kWh
Electricity Demand $79,870 3,415
kW-mo/yr
TOTAL YEARLY COSTS $123,883
RECOMMENDED SAVINGS* $47,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $23,815 $6,140 $25,637
349,277
kWh
$10,947
-
kW-mo/yr
$(-12,769.0)
-
MMBtu
-
02 2.3132: Recharge batteries on during off-peak demand periods $14,497 $72,900 $(-921.0)
(-12,543)
kWh
$15,418
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,738 $11,315 $2,868
31,618
kWh
$2,845
-
kW-mo/yr
- $25
04 2.4133: Use most efficient type of electric motors $2,534 $2,950 $1,284
17,487
kWh
$1,250
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $451 $700 $451
6,149
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $157 $400 $157
2,151
kWh
- - -
TOTAL RECOMMENDED $47,192 $94,405 $29,476
394,139
kWh
$30,460
-
kW-mo/yr
$(-12,769.0)
-
MMBtu
$25
TOTAL IMPLEMENTED $32,538 $21,105 $30,240
404,531
kWh
$15,042
-
kW-mo/yr
$(-12,769.0)
-
MMBtu
$25
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs