Assessment Year | 2018 |
---|---|
Principal Product | Dental Implants & Abutments |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3843: Dental Equipment and Supplies |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
121,000
ft2
|
Annual Production | 4,000,000
units
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $199,385 | 2,958,198 |
kWh
|
$0.067 |
Electricity Demand | $12,803 | 476 |
kW-mo/yr
|
$26.91 |
Electricity Fees | $8,252 | - |
|
- |
Natural Gas | $3,399 | 399 |
MMBtu
|
$8.52 |
TOTAL YEARLY COSTS | $223,839 | |||
RECOMMENDED SAVINGS* | $39,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,751 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $27,423 | $97,740 |
$(-1,336.0)
(-19,820)
kWh
|
$28,759
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,835 | $13,230 |
$3,347
49,681
kWh
|
$2,431
-
kW-mo/yr
|
$57 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,116 | $10,515 |
$3,116
46,227
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,214 | $1,000 |
$2,214
32,842
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,279 | $600 |
$1,279
18,976
kWh
|
- | - | |
TOTAL RECOMMENDED | $39,867 | $123,085 |
$8,620
127,906
kWh
|
$31,190
-
kW-mo/yr
|
$57 | ||
TOTAL IMPLEMENTED | $36,751 | $112,570 |
$5,504
81,679
kWh
|
$31,190
-
kW-mo/yr
|
$57 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs