ITAC Assessment: SD0562
ITAC logo
ITAC Assessment: SD0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Dental Implants & Abutments
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 121,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,385 2,958,198
kWh
Electricity Demand $12,803 476
kW-mo/yr
Electricity Fees $8,252 -
Natural Gas $3,399 399
MMBtu
TOTAL YEARLY COSTS $223,839
RECOMMENDED SAVINGS* $39,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $27,423 $97,740 $(-1,336.0)
(-19,820)
kWh
$28,759
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,835 $13,230 $3,347
49,681
kWh
$2,431
-
kW-mo/yr
$57
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,116 $10,515 $3,116
46,227
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,214 $1,000 $2,214
32,842
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,279 $600 $1,279
18,976
kWh
- -
TOTAL RECOMMENDED $39,867 $123,085 $8,620
127,906
kWh
$31,190
-
kW-mo/yr
$57
TOTAL IMPLEMENTED $36,751 $112,570 $5,504
81,679
kWh
$31,190
-
kW-mo/yr
$57
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs