ITAC Assessment: SD0561
ITAC logo
ITAC Assessment: SD0561
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Metal Finishings
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 25,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,313 380,560
kWh
Electricity Demand $31,348 2,607
kW-mo/yr
Electricity Fees $9,084 -
Natural Gas $32,041 4,327
MMBtu
TOTAL YEARLY COSTS $113,786
RECOMMENDED SAVINGS* $5,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,515 $1,500 $1,515
13,946
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $1,493 $3,414 $1,493
13,752
kWh
- -
03 2.2511: Insulate bare equipment $1,167 $2,318 - - $1,167
-
MMBtu
04 2.4133: Use most efficient type of electric motors $670 $683 $406
3,734
kWh
$264
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $615 $1,015 $615
5,659
kWh
- -
TOTAL RECOMMENDED $5,460 $8,930 $4,029
37,091
kWh
$264
-
kW-mo/yr
$1,167
-
MMBtu
TOTAL IMPLEMENTED $2,800 $3,198 $2,536
23,339
kWh
$264
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs