ITAC Assessment: SD0560
ITAC logo
ITAC Assessment: SD0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Blood Analyzers
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 190
Plant Area 40,000
ft2
Annual Production 500
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,790 1,725,341
kWh
Electricity Demand $143,699 4,011
kW-mo/yr
Electricity Fees $1,315 -
TOTAL YEARLY COSTS $321,804
RECOMMENDED SAVINGS* $48,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $18,197 $59,204 $(-1,349.0)
(-13,177)
kWh
$19,546
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $14,240 $11,880 $14,240
138,934
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,961 $19,600 $7,676
74,884
kWh
$3,956
-
kW-mo/yr
$329
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,948 $1,200 $2,948
28,763
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,307 $600 $1,307
12,751
kWh
- -
TOTAL RECOMMENDED $48,653 $92,484 $24,822
242,155
kWh
$23,502
-
kW-mo/yr
$329
TOTAL IMPLEMENTED $29,149 $32,680 $24,864
242,581
kWh
$3,956
-
kW-mo/yr
$329
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs