ITAC Assessment: AS0329
ITAC logo
ITAC Assessment: AS0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Artificial Arteries
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 32,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,251 2,182,560
kWh
Electricity Demand $13,981 5,406
kW-mo/yr
Electricity Fees $9,933 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,200 $13,655 $6,547
90,360
kWh
$1,653
-
kW-mo/yr
02 2.7135: Install occupancy sensors $615 $1,500 $476
6,550
kWh
$139
-
kW-mo/yr
03 2.2622: Replace existing chiller with high efficiency model $6,444 $43,930 $5,291
73,022
kWh
$1,153
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $94 $48 $77
1,055
kWh
$17
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $591 $737 $591
8,140
kWh
-
TOTAL RECOMMENDED $15,944 $59,870 $12,982
179,127
kWh
$2,962
-
kW-mo/yr
TOTAL IMPLEMENTED $591 $737 $591
8,140
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs